Subject: running ensembles with sstcyc=.false.
From: Gary Bates (gtb@cdc.noaa.gov)
Date: Fri Jan 11 2002 - 11:21:21 MST
Hi,
I've done a 20year control run with CCM3, and now I want
to run 20 branch runs off this control (initialized 1 year apart).
Each branch run will be 2 years in length with idealized SSTs
changing monthly (sstcyc=.false.); these 2 year SSTs will be the
same in each branch run.
The CCM checks the 'date' variable on the SST file with the
date of each branch run. Do I have to make 20 SST files (the same data
but with differing dates) or is there a way to get around this
and use the same SST file for each of the 20 branch runs?
Thanks in advance,
Gary
This archive was generated by hypermail 2b27 : Tue Jan 22 2002 - 10:02:34 MST